Download Print this page

Advertisement

Quick Links

PLEASE READ THESE INSTRUCTIONS BEFORE COMMENCING ASSEMBLY.
must be installed in accordance with these instructions.
against Bill of Lading and Parts list.
reported to your distributor within 10 days of receipt of your order.
properly installed and maintained, equipment will give many years of Safe,
Trouble-Free use.
must be tightened and broken parts must be replaced as they can possibly
create dangerous situations leading to unnecessary accidents.
Surfacing should be used under all playground equipment.
publications, available at no charge, from the Consumer Product Safety
Commission, include "A Handbook for Public Playground Safety".
receive your free copy by calling 1-301-504-7908.
PACKING LIST
1
Hardware Bag
1
6' Sectional Slide
12
903-001
Pipe Clamp
3
903-002
Deck Clamp
1
903-141
Spiral Slide Z Bracket
2
903-214
T Slide Leg
1
903-286
Slide Center Support
1
903-306
Arch Entry Panel
1
903-324
Step Leg
2
903-327
Hand Rail
1
905-710
Triangle Deck
1
905-712
6' deck steps
3
913-112
Post 12'6"
1
913-115
Slide Guard 48"
1
913-117
Ten Rung Wall
1 SKID
S
902-290 6' Sectional Slide
IMPORTANT
Periodically check for loose or broken parts.
1 SLIDE
2 TOTAL PCS
Check your shipment
Any missing or broken parts must be
Appropriate
2
126-701
3/8" x 1 ¼" Button Head Bolt
11
126-702
3/8" x ¾" Button Head Bolt
2
226-602
3/8" Nylon Insert Lock Nut
15
316-601
3/8" Flat Washer
1
805-532
Warning Label
1
805-534
SportsPlay Label
1
Maintenance Checklist
953 # Weight
1
Page
Rev. 1/22/04
All equipment
When
Loose bolts
Resilient
You can
HARDWARE BAG
Class 70

Advertisement

loading
Need help?

Need help?

Do you have a question about the 902-290 and is the answer not in the manual?

Questions and answers

Summary of Contents for SportsPlay 902-290

  • Page 1 902-290 6’ Sectional Slide Page Rev. 1/22/04 IMPORTANT PLEASE READ THESE INSTRUCTIONS BEFORE COMMENCING ASSEMBLY. All equipment must be installed in accordance with these instructions. Check your shipment against Bill of Lading and Parts list. Any missing or broken parts must be reported to your distributor within 10 days of receipt of your order.
  • Page 2: Assembly And Installation

    902-290 6’ Sectional Slide Page Rev. 1/22/04 GENERAL USE/FALL ZONE & FOOTING RECOMMENDATIONS Stationary & Portable equipment – Use/Fall zones should extend a minimum of 6 feet in all directions from the perimeter of the equipment ground space. This area should be covered with the required amount of resilient safety surfacing material.
  • Page 3 902-290 6’ Sectional Slide Page Rev. 1/22/04 NOTE: Slides should be installed in shaded areas or face NORTH to prevent direct sun on slide’s chute. NOTE: Plumb and level entire unit. Tighten all nuts & Bolts until lock washers are flat.
  • Page 4 902-290 6’ Sectional Slide Page Rev. 1/22/04 Installing deck clamps Install deck clamps to the center of the deck corners. If clamps are off center, then the line of posts will not be straight, nor will components connect correctly. Picture shows deck clamp being tightened to post with a 3/8”...
  • Page 5 902-290 6’ Sectional Slide Page Rev. 1/22/04 ck clamp set to corners Dig first four holes e marker to mark 22” from bottom of posts. Use these marks so you can run a 4’ level across marks to make sure the tops of the posts are equal to each other.
  • Page 6 902-290 6’ Sectional Slide Page Rev. 1/22/04 Install red plastic end caps on post bottoms. Install 10” square plywood squares in bottom of holes. Since your holes are 12” diameter and posts are centered in holes you have approx. 3.5” all around the post. Block the posts into center of holes when posts are on bubble.
  • Page 7 902-290 6’ Sectional Slide Page time leveling your posts to achieve bubble. Deck stand or table holds deck Rev. 1/22/04 while you build around it. Blocks stabilize the posts while table stabilizes the deck. The second method is to pre-install the (4) deck clamps so that there is 42 ¼”...
  • Page 8 902-290 6’ Sectional Slide Page Use magnetic levels on all sides of the round posts. Always adjust the posts Rev. 1/22/04 into level by gently bumping the bottom with a construction bar. Trying to push the posts into “bubble” in the top or middle will throw off your evious work.
  • Page 9 902-290 6’ Sectional Slide Page Rev. 1/22/04 TYPICAL DECK DEMENSIONS: Decks are 48” square A. Diagonal distance between post holes = 67.5” B. Center to center between posts = 48” C. Distance between bolt holes in deck clamps = 42 ¼”...
  • Page 10 902-290 6’ Sectional Slide Page Posts must be blocked solidly for a stable, ongoing installation. Blocks are Rev. 1/22/04 removed just before concrete is installed. SportsPlay Equipment, Inc.,...
  • Page 11: Parts List

    It is a good idea to put a couple of equal sized shims under the wall while installing. Level the wall. Review the clamp instructions for sideways attachment of clamp. SportsPlay Equipment, Inc., 5642 Natural Bridge, St. Louis, MO 63120 (314) 389-4140 www.sportsplayinc.com...
  • Page 12 Tighten until lock nut is flush with thread end of bolt. Make sure arch entry clamps are level to each other and tighten. Fasten top portion of handrails with 3/8” by 3/8” setscrew. SportsPlay Equipment, Inc., 5642 Natural Bridge, St. Louis, MO 63120 (314) 389-4140 www.sportsplayinc.com...