Summary of Contents for SportsPlay HERCULES CLIMBER VII
Page 1
902-300 HERCULES CLIMBER VII INSTALLATION INSTRUCTION INSTALLATION DETAILS Recommended crew (Adult): 2 Installation time: 8 hrs (16 man hrs over two days) User age: 2-12 yrs Use zone: 72” from the furthest point of structure Weight: 800 SURFACING: Use of safety surfacing in compliance with ASTM specification F1292 is required.
Page 2
902-300 HERCULES CLIMBER VII INSTALLATION INSTRUCTION PARTS LIST PART # DESCRIPTION PART # DESCRIPTION 913-108 5” O.D x 11’4” Post 905-302 Net for Hercules Climber 905-303 Angle Net For Hercules Climber 913-398 3.5” O.D.x6’2” Post 905-261 T 27 Torx Bit 315-996 Red Bottom End Cap 5”...
Page 3
902-300 HERCULES CLIMBER VII INSTALLATION INSTRUCTION FOOTING INFORMATION Total footing depth is 23” less the height of the surfacing plus the height of the blocking material. If you are using 12” of surfacing the footing hole would need to be 11” plus the height of the blocking material (refer to both the side and front cutaway views to the right).
Page 4
902-300 HERCULES CLIMBER VII INSTALLATION INSTRUCTION February 17, 2010...
SPECIFICATIONS INSTALLATION TIPS & TROUBLE SHOOTING Panel- ¾” UV protected HDPE SportsPlay Equipment Inc. recommends pre-drilling the holes in the post when attaching a four-hole bracket with a Hardware – Stainless steel & tamper resistant number #7 drill bit. This will make the attachment of the ...
902-300 HERCULES CLIMBER VII INSTALLATION INSTRUCTION BEFORE YOU BEGIN In addition to the components on the packing list you will need a post hole digger, level, tape measure, drill, 9/16” wrench, hack saw, blocking material, marking paint, and cement. INSTALLATION STEPS...
Page 7
902-300 HERCULES CLIMBER VII INSTALLATION INSTRUCTION INSTALLATION STEPS CONTINUED __6) Install Vertical Support for Angle Net: Both Vertical Supports for the Angle Net (6) will install to the 5” Post that the Horizontal Support for the Angle Net attached to. The first Vertical Support for Angle Net will install directly above one of the Horizontal Supports, it will need to be 15”...
Page 8
902-300 HERCULES CLIMBER VII INSTALLATION INSTRUCTION INSTALLATION STEPS CONTINUED __9) Block and level: You will need to block the two 3 ½” posts and the one 5” post that you have installed the Angle Net to. After the three posts are secure and level you can pour cement or a “HOT MIX”...
Page 9
902-300 HERCULES CLIMBER VII INSTALLATION INSTRUCTION INSTALLATION STEPS CONTINUED _15) Once the entire playground has been installed and you have verified that the entire playground is level you can add the __11) Attach the plastic Panel: You will need eight each of the concrete to the footing holes.