46
47
43
PROVISION FOR CABLES
- Ensure cables
are fitted through base plate
before concreting
46
43
in place.
- Remove knock-outs
from gearbox to allow for cable entry.
47
- Route cables in front of battery (D3/D5 motors) as shown above.
- Seal cable entry holes with silicone sealer.
9
Need help?
Do you have a question about the D3 and is the answer not in the manual?