STIEBEL ELTRON SHW 200 S Operation And Installation page 29

Sealed unvented floorstanding dhw cylinder
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 18
INSTALLATION
Specification
Dual circuit operation, single meter measurement with power
supply utility contact
In the following connection examples, the rapid heating output
during peak tariff periods is given after the forward slash.
Note the position of the circuit breaker in the control panel.
2/4 kW
Switch position I
4/4 kW
Switch position Il
2/6 kW
Switch position I
3/6 kW
Switch position I
4/6 kW
Switch position I
6/6 kW
Switch position Il
1 Pushbutton for rapid heating
2 Power supply utility contact
www.stiebel-eltron.com
1/N/PE ~ 230 V
1/N/PE ~ 230 V
1
2
3/N/PE ~ 400 V
1
2
3/N/PE ~ 400 V
1
2
3/N/PE ~ 400 V
3/N/PE ~ 400 V
1
2
Single circuit operation
In the following connection examples, the output of the rapid
heater is given in brackets.
Note the position of the circuit breaker in the control panel.
2(4) kW
Switch position I
4(4) kW
Switch position Il
2(6) kW
Switch position I
3(6) kW
Switch position I
4(6) kW
Switch position I
6(6) kW
Switch position Il
1/N/PE ~ 230 V
1/N/PE ~ 230 V
3/N/PE ~ 400 V
3/N/PE ~ 400 V
3/N/PE ~ 400 V
3/N/PE ~ 400 V
SHW S |
29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shw 300 sShw 400 s182120182121182122

Table of Contents