Download Print this page

Pinnacle Gable Series Assembly Instructions Manual page 13

Gardenshed 2.25w x 2.25d x 2.19hm
Hide thumbs Also See for Gable Series:

Advertisement

Assemble the side wall panels
Step 3:
Place 3 x parts 18M (sheeting) on your worktable and join together with self-tapping screws as per the diagram. Now fit parts 26K,
26J (top channels) and parts 26A, 26B (bottom channels) to the sheeting by tapping or sliding it in. Make sure the small lip of the
channel is always facing out. This ensures rainwater cannot build up inside your shed. Make sure parts 26K and 26J are used as top
side channels. TIP (before applying connectors): to help panel and screw holes to line up, fasten screws one at a time from one side
of the wall to the other and pull panel away from screw each time to match up holes.
Now fix parts 34R and 34L (mid wall channels) to the sheeting with self-tapping screws. Please note the groove should face
downwards. Fix other channels using self-tapping screws through both sides of the connectors and enhance the strength by applying
part 66 (channel connector). Note: Screws are applied to both sides of the connectors. All screws marked with a cross should not be
fixed at this stage.
66
ROOF TOP EDGE
26J
26K
18M
34R
18M
18M
26B
34L
66
26A
RIDGES FACING UP
13

Advertisement

loading

Related Products for Pinnacle Gable Series