Maintenance; System Diagram; Connection Pipe Vacuum Pumping - Gree FLEXX Series Service Manual

Dc inverter heat pump condensing unit
Hide thumbs Also See for FLEXX Series:
Table of Contents

Advertisement

GREE

4 Maintenance

4.1 System Diagram

4.2 Connection Pipe Vacuum Pumping

Make sure the outlet of vacuum pump is away from fire source and is well-ventilated.
Before vacuum pumping, make sure the unit cut-off valves are closed.
When vacuum pumping, both the liquid pipe and the gas pipe must be pumped.
(1) Remove the caps of the liquid valve, gas valve and also the service port.
(2) meanwhile the gas and liquid valves should be kept closed in case of refrigerant leak.
(3) Connect the hose used for evacuation to the vacuum pump.
(4) Open the switch at the lower pressure side of the manifold valve assembly and start the vacuum pump.
Meanwhile, the switch at the high pressure side of the manifold valve assembly should be kept closed,
otherwise evacuation would fail.
(5) The evacuation duration depends on the unit's capacity, generally.
FLEXX36HP230V1AO
FLEXX60HP230V1AO
And verify if the pressure gauge at the low pressure side of the manifold valve assembly reads -0.1Mpa
(-750mmHg), if not, it indicates there is leak somewhere. Then, close the switch fully and then stop the vacuum
pump.
Model
DC INVERTER HEAT PUMP CONDENSING UNIT
NOTICE
55
Time(min)
35
40

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents