Fein Dustex 25L Turbo I Manual page 21

Table of Contents

Advertisement

Dustex 25L; 35L
7. Assembly
Assembling base plate (applies to: Turbo I; Turbo II)
1
2
1. Thread cable with plug into opening (1).
2. Position cable clamping piece (2) and screw down.
3. Wind cable from motor through ferrite sleeve (3) twice.
4. Wind cable of sensor through ferrite sleeve (4) three times.
5. Wind cable of sensor through ferrite sleeve (5) twice.
C-SC_CSSM
Version 1.0
3
2015-02-27
All rights reserved by FEIN, especially in case of industrial rights registration.
FEIN retains all rights of disposal, such as copying and circulation
4
.
5
Tools:
- Torx T15
(length: 89 mm)
Page 21 of 35

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dustex 35l turbo ii9202722300092028223000

Table of Contents