John Shearer Pasture Renovation Drill Operator's Manual page 9

Table of Contents

Advertisement

02.19M143J1
PRE-DELIVERY CHECK
1. On delivery of PASTURE RENOVATION DRILL ensure there are no
shortages.
2. Check Implement equipment, to ensure as ordered.
3. Check for trans-shipping damage.
4. Refer to lubrication section, page 10, for greasing and routine check points.
5. Check and tighten bolts and nuts, (including wheel nuts).
6. Check tyne spacing. For specific dimensions refer to page 27-29 to 31.
7. Ensure that implement is fully assembled and operating correctly.
8. Demonstrate and explain operation to the client.
9. Explain terms and conditions of Warranty to client
1

Advertisement

Table of Contents
loading

Table of Contents