Uc300 Hectaremeter Calibration - John Shearer Pasture Renovation Drill Operator's Manual

Table of Contents

Advertisement

UC 300 Hectaremeter (P/N: 44430) Calibration
(for Gearbox Models)
Programming
Step 1 –hold down the programming button for 3 seconds until
the screen shows with Un 0 as shown below. This means that
the system will be using the metric system. If you are looking to
use the imperial system simply
press the + arrow so the
display shows UN 1. When
happy with ether metric of
imperial press the
programming button once
Step 2 – For the next step the display should read C with some
numbers followed after it. The C represents the amount of
pulses emitted by the speed sensor after each 100 linear
meters. The default value for this function is 200 as shown
below. If unsure of the value you need for your machine simply
press the + and – buttons simultaneously to get the screen to
read out C 0 as shown below. Once the screen reads out C 0
simply run your machine for 100 meters and the value displayed
should automatically go up accordingly. After you have found
the automated value, press Program again to move onto the
next step.
Step 3 – for the final step the screen should have L displayed.
L is the working width of
your machine so simply
input the width of the
machine into the display
using ether the + or –
button. (if the buttons are
held down the displayed
figures move faster in the
given direction). Finally hit
Program to save all the
inputted settings.
48

Advertisement

Table of Contents
loading

Table of Contents