Lubrication; Tyre Pressures - John Shearer Pasture Renovation Drill Operator's Manual

Table of Contents

Advertisement

LUBRICATION

Item
Operation
Wheel Hub
Grease
Axle Rockshafts
Grease
Clutch
Grease
Tynes
Grease
Distributor shafts
Grease
Trimming Screw
Grease
Check for leaks (topup if
Varidrive Gearbox
necessary-
Oil)
Check Pressure
Tyres
Check adjustment
Chains
Annual Maintenance – thorough
Chains
check and re-grease
Check for tightness
General Inspection
(Nut & Bolts)
Hopper
Clean out at end of each day
(Particularly Hydroscopic
Fertilizer)
Grease Nipples
Lubricate all prior to storage at
the end of each working period
DO
NOT
LEAVE
FERTILISER
OVERNIGHT. (PARTICULARY HYGROSCOPIC FERTILISER,
WHICH WILL TAKE UP MOISTURE AND HARDEN)
Schedule
200hrs
Daily / 10hrs
Daily / 10hrs
Daily / 10hrs
50hrs
Annually
Annually
50W/40 Motor
SAE
Daily
Daily
Annually
Daily
Daily
Seasonally
IN
THE
IMPLEMENT

TYRE PRESSURES

TYRE PRESSURES ARE IMPORTANT
OVER INFLATION will impair flotation -
Increasing sowing depth variations as ground conditions vary.
UNDER INFLATION can result in tyre failures.
TYRE
SIZE
2.0
Tyne Disc
235/75 R15
TYRE
250
275
PRESSURE
kPa
psi
36
215/85 R16
TYRE
PRESSURE
kPa
psi
SPEED LIMIT 25km/h (10km/h SOWING)
10
Pasture Renovation Drill
2.4
2.8
Tyne
Disc Tyne Disc Tyne Disc
280
300
40
41
44
450
480
65
70
02.19M143J1
3.3
525
560
76
81

Advertisement

Table of Contents
loading

Table of Contents