Test The Outputs
System Pump (Sys Pmp)
If a system pump is connected to the Sys Pmp terminal (5)
and N terminal (6), make sure that power to the terminal block
is off, and install a jumper between the Power L and the Sys
Pmp terminals (3 and 5). Install a second jumper between the
Power N and N terminals (4 and 6). When power is applied to
the Power L and Power N terminals (3 and 4), the system pump
should start. If the pump does not turn on, check the wiring
between the terminal block and pump, and refer to any instal-
lation or troubleshooting information supplied with the pump. If
the pump operates properly, disconnect the power and remove
the jumpers.
Boiler
If the boiler circuit is connected to the Boiler terminals (7 and 8), make sure power to the boiler circuit is off, and install a
jumper between the terminals. When the boiler circuit is powered up, the boiler should fire. If the boiler does not turn on, refer
to any installation or troubleshooting information supplied with the boiler (The boiler may have a flow switch that prevents
firing until the boiler loop pump is running). If the boiler operates properly, disconnect the power and remove the jumper.
Mixing Valve Actuator
Make sure power to the actuator circuit is off and install a jumper between the Pwr Mix (9) and the Opn (10) terminals.
When the circuit is powered up, the actuator should move in the open direction. If it does not, check the wiring between the
terminals and the actuator. Refer to any installation or troubleshooting information supplied with the actuator. If the motor
closes instead of opening, the wiring of the actuator must be reversed. If the valve opens correctly, turn off the power to
the circuit and remove the jumper. Install a jumper between the Pwr Mix (9) and the Cls (11) terminals. When the circuit is
powered up, the valve should move in the closing direction. If it does not, check the wiring between the terminals and the
actuator. Refer to any installation or troubleshooting information supplied with the motor. If the motor closes correctly, turn
off the power to the circuit and remove the jumper.
Connecting The Control
Make sure all power to the devices and terminal blocks is off, and remove any
remaining jumpers from the terminals.
Reconnect the terminal blocks to the control by carefully aligning them with their
respective headers on the control, and then pushing the terminal blocks into the
headers. The terminal blocks should snap firmly into place.
Install the supplied safety dividers between the unpowered sensor inputs and the
powered 230 V (ac) or 24 V (ac) wiring chambers.
Apply power to the control. The operation of the control on power up is described in
the Sequence of Operation section of this brochure.

Cleaning

The control's exterior can be cleaned using a damp cloth. Moisten cloth with water and wring out prior to wiping control. Do not
use solvents or cleaning solutions.

DIP Switch Settings

The DIP Switch settings on the control are very important and should be set to the
appropriate settings prior to making any adjustments to the control through the user
interface. The DIP switch settings change the items that are available to be viewed
and / or adjusted in the user interface.
ADVANCED / INSTALLER
The Advanced / Installer DIP switch is used to select which items are available to be viewed and / or adjusted in the user interface.
30% ENABLE / 10% ENABLE
The position of the 30 % Enable / 10 % Enable DIP switch determines at which valve position the control will close the Boiler con-
tact under normal conditions. This switch is only operational if the Boiler Sensor DIP switch is set to Return. Refer to section C2.
230 V (ac)
L
N
13 of 20
System
Pump
30% Enable
Advanced
Return
Boiler Sensor
Supply
Installer
10% Enable