Download Print this page

Installation - Pentair INTELLICHLOR COMSYS-10 Installation Manual

Salt chlorinator

Advertisement

2

Installation

Before installing the IntelliChlor CIC60 system, please read all SAFETY PRECAUTIONS below.
Kit Contents
- Five Power Centers (one primary, four secondary)
- One CIC60P cell
- Four CIC60S cells
- Installation Guide (this manual)
Required Tools
- Medium phillips or flathead screwdriver (and ten screws)
- Electric drill and 1/4" masonry drill bit. (To mount Power Center Bank)
SAFETY PRECAUTIONS - PLEASE READ BEFORE PROCEEDING
IMPORTANT SAFETY PRECAUTIONS. PLEASE READ THE FOLLOWING:
Read all the safety precautions in this manual before attempting any electrical wiring. Be
sure to read and follow all safety Instructions on page ii. Wiring should only be performed
by a qualified professional. When using electrical products, basic precautions should
always be followed, including the following:
RISK OF ELECTRIC SHOCK, WHICH CAN RESULT IN SERIOUS INJURY OR DEATH. Before
attempting installation of service, ensure that all power to the circuit supplying power to the
system is disconnected/switched off at the circuit breaker. The Power Center must be
interconnected with pool pump motor power source. This insures the IntelliChlor chlorinator and
pool pump will switch on and off together.
• Grounding (earth bonding) is required. The unit should be installed by a qualified service
person and grounded.
CAUTION - Install the IntelliChlor cell a minimum of two (2) feet from the heater outlet.
• Allow ample access to the IntelliChlor control panel buttons and the IntelliChlor Power Center.
• Pipe couplings: Schedule 80, maximum pressure 150 psi at 70° F.
• Operate unit with a minimum flow rate of 25 gpm per celll. For high flow applications, use a
bypass loop.
Mount Power Center Banks To Wall
1. Locate a wall near the pool equipment area within 15 feet of the IntelliChlor cells. Position the
CPC103 POWER CENTER BANK on the wall at eye level. Mount and secure the power center
bank to the wall using six (6) screws (not provided in kit). See illustration on next page.
2. Position the CPC202 POWER CENTER BANK on the wall at eye level either just below or to
the right of the CPC103.
3. Mount and secure the CPC103 power center bank to the wall using six (6) screws (not provided in
kit). See next page for illustration.
IntelliChlor Electronic Chlorine Generator COMSYS-10 Installation Guide

Advertisement

loading

This manual is also suitable for:

520974