Dc Millivolts Measurement Test - Fluke ProcessMeter 789 Calibration Manual

Hide thumbs Also See for ProcessMeter 789:
Table of Contents

Advertisement

789
Calibration Manual

DC Millivolts Measurement Test

1. Put the calibrator in Standby (
2. Put the UUT rotary switch in the
3. Connect the calibrator to the
4. Apply the values from the calibrator shown in Table 9 and compare the readings on
SpanCheck
OFF
A
789 Range
No Range Switching
No Range Switching
20
Figure 8.
the UUT to the acceptable readings shown.
UUT
789
PROCESSMETER
100%
MIN MAX
RANGE
HOLD
%STEP
COARSE
FINE
0%
REL
Hz
mV
mA
V
A
V
mA
mA
250
mA
HART
LOOP POWER
mA
COM
V
Figure 8. DC mV Measurement Test Connections
Calibrator DC Voltage
100 mV
300 mV
) mode.
STBY
U
position.
d
and
terminals on the UUT as shown in
COM
5500A
CALIBRATOR
NORMAL
AUX
SCOPE
V,
,
A,
-SENSE,
200V PK
RTD
AUX V
MAX
STBY
OPR
HI
1000V
20V
7
8
RMS
RMS
MAX
MAX
TRIG
LO
OUT
4
5
1V PK
MAX
20V PK
MAX
1
2
TC
/ +
0
20V PK
MAX
Table 9. DC mV Test
Minimum Reading
99.8 mV
299.6 mV
5500A
PREV
EARTH
SCOPE
BOOST
MENU
µ
dBm
sec
EDIT
9
m
V
Hz
SETUP
RESET
FIELD
n
W
¡F
NEW
6
k
A
¡C
CE
REF
p
MEAS
TRIG
3
M
F
TC
OUT
MULT
DIV
SHIFT
ENTER
x
÷
Maximum Reading
100.2 mV
300.4 mV
POWER
I
O
adm005F.EPS

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents