Checking The Continuity Test Function - Fluke ProcessMeter 789 Calibration Manual

Hide thumbs Also See for ProcessMeter 789:
Table of Contents

Advertisement

Checking the Continuity Test Function

1. Put the calibrator in Standby (
V
position.
2. Connect the calibrator to the
Figure 6.
G
3. Press
4. Using the calibrator, apply a resistance output of 230 ± 20 Ω. The beeper should stay
off.
5. Using the calibrator, apply a resistance output of 120 ± 20 Ω. The beeper should turn
on.
UUT
789
PROCESSMETER
100%
MIN MAX
RANGE
SpanCheck
%STEP
COARSE
0%
REL
mV
mA
V
A
V
OFF
mA
LOOP POWER
A
mA
COM
STBY
and
COM
(continuity beeper) on the UUT to select the continuity test.
HOLD
FINE
Hz
mA
mA
250
HART
1000V
V
Figure 6. Continuity Test Connections
) mode, and turn the UUT rotary switch to the
d
terminals on the UUT as shown in
5500A
5500A
CALIBRATOR
NORMAL
AUX
SCOPE
V,
,
A,
-SENSE,
200V PK
PREV
RTD
AUX V
MAX
STBY
OPR
EARTH
SCOPE
BOOST
MENU
HI
µ
dBm
sec
7
8
9
20V
m
V
Hz
RMS
RMS
MAX
MAX
TRIG
LO
OUT
n
W
¡F
4
5
6
k
A
¡C
1V PK
MAX
20V PK
p
MAX
1
2
3
M
F
TC
/ +
0
SHIFT
ENTER
20V PK
MAX
789 ProcessMeter
Calibration Verification
EDIT
SETUP
RESET
FIELD
NEW
CE
REF
MEAS
TRIG
TC
OUT
POWER
MULT
DIV
x
÷
I
O
adm008F.EPS
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents