ABB Symphony Harmony Series Instructions Manual page 75

Hide thumbs Also See for Symphony Harmony Series:
Table of Contents

Advertisement

Procedure
on the proper locations on the front mounting brackets
(Fig. PR3-1).
4. Use the bladed screwdriver, and appropriate number of
pan head screws and lockwashers to secure the filler plates to
the front mounting brackets.
C AG E N U T, S C R E W,
L O C K W A S H E R (4 FO R
LA R G E F IL L E R PA N E L ,
2 FO R S M A L L FIL L E R
PA N E L S
S M A L L FIL L E R
PA N E L (2)
Figure PR3-1. Filler Panel Installation
PR3 - 2
NOTE: Figure
PR3-1
shows a single power chassis configuration. In dual
power chassis configurations the top power chassis takes the place of the large
filler panel.
a. For single power chassis installations, install the cage
nuts on the 1st, 3rd, 4th, 9th, 10th, and 12th holes from
the top of the cabinet.
b. For dual power chassis installations, install the cage
nuts on the 1st, 3rd, 10th, and 12th holes from the top of
the cabinet.
FR O N T D O O R R E M OV E D
L A R G E F ILL E R PA N E L
(O N LY IF S E C O N D
P O W E R C H A S S IS
N OT IN S TA L LE D )
T0447 0A
WBPEEUI210509A0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents