JDS Uniphase ValidatorPRO-NT, Cu User Manual page 43

Table of Contents

Advertisement

Once the tests are complete for a particular cable, the Cable
Test Schedule displays the results and the test highlight
automatically increments to the next cable in the list.
There are six functions available using the soft keys. The
Function (F4) key is used to show the additional functions.
The six functions available are:
1. Add Cable (ADD CBL)
2. Delete Cable (DEL CBL)
3. Results
4. Page Up (PG UP)
5. Page Down (PG DOWN)
6. SORT
Add and delete cable allows cables to be added to or
deleted from the cable test schedule. The ID, Type, From
and To fields can be edited for new or existing cables using
the alphanumeric keypad.
Results allows results of cable tests to be viewed on the
ValidatorPRO-NT, Cu. Please see the following section for
more details on viewing test results.
Page up and page down can be used instead of the up and
down arrows to allow for quicker scrolling through long cable
test schedules.
Sort allows the cable test schedule to be sorted by any of the
five columns. Select the column to be sorted using the arrow
keys and press the SORT function key. The entire cable test
schedule will then be sorted by that field. Pressing sort twice
will reverse the sort order.
In addition to the functions available with the soft function
keys, pressing the menu key will bring up window with
several other choices:
Cable Details
Go to Top
Go to Bottom
First untested
39
Auto Test

Advertisement

Table of Contents
loading

Related Products for JDS Uniphase ValidatorPRO-NT, Cu

This manual is also suitable for:

ValidatorproValidatorpro-nt

Table of Contents