Auto Test

9 Auto Test Menu

Creating a job within Plan-Um and then running Auto Tests
from the Cable Test Schedule on the ValidatorPRO-NT, Cu
is the easiest and most efficient way to test cables and
document the results. See the Plan-Um section of this
manual for detailed instructions on how to integrate job
information and test results between Plan-Um and the
ValidatorPRO-NT, Cu. Creating a job in Plan-Um and
opening it on the ValidatorPRO-NT, Cu is the simplest way
to create a Cable Test Schedule and enter Site Information,
Tester Information, and Custom Cable Definitions. If it is
desired to create or edit this information on the
ValidatorPRO-NT, Cu, the Auto Test menu allows this.
Figure 9.1: Auto Test Menu
The most common workflow is to open a job file from the
USB thumb drive using Job Utilities then use the cable test
schedule to run tests. All test results will be stored on the
USB thumb drive. Once all tests are complete, the file can
be saved, the USB thumb drive removed from the
ValidatorPRO-NT, Cu, connected to a PC, then the file
opened with Plan-Um on a PC allowing reports to be printed.