Hardware Installation - Acksys RailBox Series Quick Installation Manual

Multifunction access point for railways and rugged environment
Hide thumbs Also See for RailBox Series:
Table of Contents

Advertisement

Available languages

Available languages

1. Plug the antennas
Plug the antennas of your choice (not provided as standard) on the QMA type
connectors of WiFi interfaces).
Whatever the WIFI interface (WiFi 1 and/or WiFi2):
 For a single antenna installation, use the ANT1 connector.
 For an installation with 3 antennas, use ANT1, ANT2 and ANT3
connectors
WARNING:
It is recommended to connect a 50 ohms terminator on unused
antenna connector. If not, it may disturb radio link quality and data
throughput, and as well as waterproofness.
2. Connect the power supply
See the "specifications" section about the characteristics of the power
supply.
The device has no ON/OFF switch. It turns-on automatically when power is
applied. Check LEDs Power1 and Power2:
Power1 LED is ON if POWER1 power supply or PoE+ source is
ON.
Power2 LED is ON if POWER2 power supply is ON.
The device has no ON/OFF switch. It turns-on automatically when power is
applied. Check LED Power
Power1 LED is ON if Power1 power supply or PoE source is ON.
Power2 LED is ON if Power2 power supply is ON.
The Diag LED stays red for around 60 seconds, until the device is fully ready
to use. Then the Diag LED turns green.
PoE+ models must be exclusively powered by a PoE+ power source (802.3at
type 2 class4) connected to LAN2 connector (the use of the POWER M12
connector on PoE+ models, is not functional).
3. Connect the Ethernet cable
Plug the Ethernet cable to the device's LAN1 or LAN2 M12 connector.
Check that the corresponding LAN LED turns ON at that point.

HARDWARE INSTALLATION

-
-
2

Advertisement

Table of Contents
loading

Table of Contents