Steel Boom Rail Assembly
3 Part Boom Rail
C:1000 mm
1. Cut the zip-tie. Slide piece C into the first sleeve followed by piece D. Then slide piece D and E into the
second sleeve. During this process, pull the screw rod along with inner chain to the end rail position. See
figure 5.
2. Ensure that the notch on the connector pieces are properly aligned and completely connected.
INSTALLATION
D:1000 mm
Sleeve
31
Figure 2
E:1000 mm
Sleeve
Figure 3
Figure 4
Figure 5