International Harvester Company 15D-2 Operator's Manual page 20

Bulldozers and bullgraders for td-15(151 series) crawler tractors
Table of Contents

Advertisement

INSTALLATION
Installing trunnions •
Continued
Models
150·1
and
150·3'
only
C
lIIust.
15)
Mount both the right hand and left hand
trunnions to the trunnion pad on the track frame
with the trunnion pilot in the front pilot hole of
the mounting pad.
Secure with six 7/8 NC x 3
inch cap screws
Model15G·l
only (Jllust.
16)
1• Mount the right hand trunnion to the t
run-
nion mounting pad on the track frame with the
trunnion pilot in the front pilot hole of the mount-
ing pad and secure with five 7/8 NC x 2 inch cap
screws.
2.
Mount the left hand trunnion to the trun-
nion mounting pad on the track frame with the
trunnion pilot in the rear pilot hole of the mount-
ing pad and secure with five 7/8 NC x 2 inch cap
screws.
NOTE: Afte r the initial. four and twelve
hours of operation,
inspect and tighten the
trunnion cap screws.
Thereafter
make peri-
odic inspections.
Installing the push arms on the blade (Models 150·1,
150·2!and 150·3 onIy) (Refer to Illust.'l8)
Attach the push arms to the blade with the
push arm bracket pins.
These pins must be
installed
so the pin locking hole lines up with
the hole in the push arm brackets
on the blade.
Insert a 1/2 inch cap screw through each push
arm bracket and secure with a 1/2 inch lock nut.
Installing diagonal and upper struts (Models 150.1,
150·2/andlS(j·3 only) (Refer to Illust.18)
1. Adjust the upper struts
so that the gap
between the shoulder of the eyebolt, clevis and
the upper strut body is 1-1/16 inch on each end.
(Refer to Illust.
20.)
2.
As semble both the upper struts to the
blade and push arms.
The upper strut pins
must be installed
so the pin locking hole lines
up with the hole in the strut mounting lugs.
Insert a 1/2 inch cap screw through each
mounting lug and secure with a 1/2 inch lock
nut.
3.
Position the strut locking pins through
the strut lock loops on the blade.
This will
lock the struts
so that the adjustment will not
change.
4.
Adjust the diagonal struts
so that the
gap between the shoulder of the eyebolt and the
diagonal
strut
is one inch.
(Refer to Illust.
21.)
"'ust. 17
Trunnion components
. (For trunnion installation
see lIIust.
14,15
and
16)..
lItust. 11
Upper and diagonal struts installed.
(Models
150·1, 150·2
and
150·3
only).
5. Attach the ball socket end of the diagonal
struts to the blade (Illust.
19) and secure with
four 3/4 inch cap screws.
(Use sufficient soc-
ket shims to eliminate play and still allow the
struts to be moved easily.)
6.
Secure the opposite end of the struts
to the lug on the push arm using locking pins
1/2 inch cap screws and lock nuts.
Final ad~
justment of the diagonal struts will be done
later.
Installing push arms and blade on the tractor (Models
150·1, 150·hind 150~3only)
1. Block the rear ends of the push arms
up to the height of the trunnions.
18

Advertisement

Table of Contents
loading

This manual is also suitable for:

15g-215g-115d-115g-315d-3

Table of Contents