International Harvester Company 15D-2 Operator's Manual page 10

Bulldozers and bullgraders for td-15(151 series) crawler tractors
Table of Contents

Advertisement

INSTALLATION
General
Installing this type of equipment should be
done in a shop that is equipped with some type
of hoisting equipment.
MODELS 15D-2 AND 15G-2 ONLY: Have
available
six gallons of clean Grade-lOW heavy
duty motor oil that contains an anti-foaming
agent.
Remove all parts from their
containers.
Check all parts against the packing list in-
cluded in the envelope attached to the con-
taine r.
CAUTION: After instaliing equipment,
lu-
bricate
completely before ope rating.
Installing
front power take-off and shaft assembly
Mount the spider end (3) of the power take-
off to the fan drive pulley,
tap into the key and
secure with four 3/8 inch cap screws and lock
washers.
(lllust.3.)
" ...-40175 ...
lIIust. 3
Power take-oH and shaft assembly.
1.
SHAFT w/UNIVERSAL joint assembly.
2.
FIT TING, lubrication.
3.
SPIDER w
I
BEARINGS.
4.
RING, snap.
5.
TUBE.
6.
SPIDER w/BEARINGS.
7.
YOKE, fitting.
8.
PLATE,
lock.
9.
BOLT.
10• FIT TING, lub rication
Installing radiator guard (Models 150.2
and 15G.2 only)
To install a radiator
guard for use with hy-
draulic bulldozers
or bullgraders,
proceed as
follows:
Radiator guard to hydraulic cylinder hose(upper)
o
0
o
o
0
~__
IPA-60355
IIIust ...
Radiator guard and radiator guard to hydraulic cylinder hose
installation diagram
(Models 150·2'and 15G.2 only).
1.
Remove the hood, radiator
guard and
the radiator
from the mounting frame.
2.
Attach the gimbal crosstube
assembly
to the radiator
mounting frame by installing
the top mounting dowels and retainers.
Line
ream the lower mounting holes to 1.250-1.252
inch diameter
and install the dowels and re-
tainers.
(lliust.
4.)
3.
Use an overhead hoist and mount the
new radiator
guard by installing the top mount-
ing dowels and dowel retainers.
Locate the
lower dowel holes and line ream them to
1.250-1.252
inch diameter.
Install the lower
mounting dowels and retainers.
(Illust.
4.)
4.
Reinstall
the radiator.
Connect the
.vater inlet and outlet water hoses.
Replace
the hood and secure.
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

15g-215g-115d-115g-315d-3

Table of Contents