International Harvester Company 15D-2 Operator's Manual page 13

Bulldozers and bullgraders for td-15(151 series) crawler tractors
Table of Contents

Advertisement

INSTALLATION
9.
Coat the
"0"
rings (11 and 13) with
chassis lubricant
and place them in the grooves
of the strainer
(12).
10.
Install the oil strainer
(12) thru the
opening in the lower left side of the radiator
guard (22) so that it contacts the strainer
sup-
port guide.
NOTE: The strainer
must be installed
so
that the two tapped holes of the strainer
are
towards the outside of the guard.
11'.
Place one retainer
plate (14) in the
groove with the chamfered
end in the groove
of the strainer
(12).
12.
Align the hole in the plate (14) with
the tapped hole in the strainer
(12) and secure
with a 3/8 inch cap screw and lock washer.
In-
stall the other retainer
plate in the same manner.
CAUTION! Do not attempt to start the
tractor
engine for any reason after the hydrau-
lic pump and valve have been installed until all
piping and connecting linkage is completed and
the hydraulic system is filled with oil.
Installing radiator guard (Models lS0.1, lS0·3, lSG.1
and lSG-3 only)
To install a radiator
guard for use with
cable buUgraders
or bulldozers,
proceed as
follows:
1.
Remove the hood, radiator
guard and
radiator from the mounting frame.
.
2.
Use an overhead hoist to install the new
radiator
guard.
Install the top mounting dowels
and dowel retainers.
Locate the lower dowel
holes and line ream them to 1.250-1.252
inch
diameter.
Install the lower mounting dowels
and retainers.
(lliust.
8.)
3.
Reinstall the radiator.
Connect the
inlet and outlet water hoses.
Replace and se-
cure the hood.
Mounting the 110 cable control unit (Models 150-1 and
lSG-1 only)
Install the cable control unit support to the
radiator
guard, using two 5/8 inch cap screws
and nuts.
Using an overhead hoist,
install the
cable control unit and line the pinion shaft on
the cable control unit with the yoke fitting (7),
[Ifl.aat , 3), on theunive,rsal
jodnt ,
Line up the
four holes on the lower end of the cable control
unit with the holes in the bracket welded to the
radiator
guard.
Secure the cable control unit
with the cap screws and nuts provided.
Mounting the P·25 cable control unit (Models 150-3 and
lSG-3 only)
Refer to the P-25 and P-29 Cable Control
Units Operator's
Manual for mounting instruc-
tions.
Installing connecting linkage and controls (Models 150.1,
lS0-2,
isc.t
and lSG.2 only) (1IIlISt.
9.)
1.
Mount the control bracket (7) to the
seat side sheet on the right side of the tractor.
Secure by bolting together through existing hole
("A," Illust , 10) in the front seat support with
a 3/8 x 7/8 inch cap screw,
lock washer and
nut.
NOTE: The oil seals (5) and bearings
(6)
come as sembled in the bracket (7).
2.
Using the bracket
(7) as a template,
drill five 25/64 inch diameter
holes ("B,"
n·-
lust.
10).
Then complete securing with five
3/8 x 3/4 inch cap screws,
lock washers
and
nuts.
3.
Insert the shaft (10) up through the
bottom of bracket (7) with the shaft lever at
the bottom.
C~ntinuecl on next page.
Radiator mounting
frame assembly
Cable
radiator
guard
+
o
0
o
o
0
IPA-60356
lIIust ••
Radiator guard Installation
diagram,
(Models
150-1, 150.3, 15(;,;1
and
15G-3
only).,
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

15g-215g-115d-115g-315d-3

Table of Contents