1
4
(4 silver frame install: first step combine
the two piece of short silver frame with
the connection parts.)
7
10
(10-12 corner parts connection: put the corner parts inside the silver frame and connect another one,align the holes
as well
Please note that when install the remain two corner parts, it should be installed at the same
13
(13 Make sure no gap)
16
(16 show as pic)
19
22
25
(25 Note:There is dotted lines on all four
sides of the fabric)
28
(28 Wrong example: the silver frame is
not aligned with the dotted line)
31
34
(34 Algin all the spring to the holes of the
fabric. Make sure it is on the same line)
37
40
(40 and then Two person install the
remain springs on the contrast
way
at the same
time(show as pic))
R3 fixed frame User manual
2
(1-3 spare parts)
5
(5-8 align with the holes on both side and fasten with the screw)
8
11
14
(14 wrong example: splicing position of
the silver frame is not accurate .
That will cause wave when install the
fabric.)
17
3
(17-19 there are 7 nuts inside the silver frame, the one in the middle is for the support bar,
so it will be 3pcs on both sides.show as pic, fasten with a screw)
20
(20 Fabric install part: unfold the form on
the ground,(flat ground))
23
(23 pull the fabric on both sides at the
same time, to make sure the fabric
is basically flat)
26
(26-27
The silver frame must be aligned with the dotted line on all four sides.
(very important step to make sure the fabric is flat after installation)
show as pic)
29
(29 check again on 4 sides, you won't see
the front viewing area of the fabric.
prove the dotted line is aligned good.
(show as pic))
32
(32 Wrong example: you can see
the tension rod from outside)
35
(35 Spring installtion steps: first install
the corner springs(follow the steps
show as pic))
38
(38-39 And then install the middle springs on two sides
41
(41 after springs finish installtion, please
check the surface of screen, make
sure it's flat.and then move to next
step(show as pic))
12
15
18
1
3
21
24
27
30
33
36
39
42
3
Horizontal frame Connecting
Corner
Vertical decorative frame(2pcs)
Horizontal frame A/B(2pcs each)
connection part
(Pre-installed)
Plastic corner(4pcs)
(long :2pcs, short :4pcs)
Fabric(1pc)
Round nut
pring
apping screw(6pcs)
(18pcs Pre-installed)
(Pre-installed,10set backup)
lastic expansion
anchor(6pcs)
Installed
Hook(2pcs)
Hanging plate, m
,
M5X8 screw (20pcs)
glove(2 pairs)
2pcs each
M6X4 screw (14pcs)
6
9
(9 Please note the silver frame is
no gap(show in pic))
time)
(15 suppart bar install: insert the plastic
buckle on both sides)
(21-22 unfold the fabric:fabric face down,
show as pic)
(24 put the silver frame on the fabric)
(30-31 insert the tension rod on four sides,
and make sure the tension rods are
totally hide inside the edge of fabric)
(33 remove the tape on 4 sides)
(36-37 Make sure the springs is align the
holes of the fabric.
Please install the two springs
which is closing to the corners.
at the same
time(show as pic))
at the same time(show as
(42 install the left&right decorative frame
first(should put the blue foam under
the edge of long frame of the screen)
to make the screen floating.then you
can install the decorative easily)
Support bar and connecting piece
Strengthen Plate
Black audio mesh
(only equipped with woven
acoustic fabric)
Fasten piece (12 pcs)
M5X8 Countersunk M5X10 screw(10pcs)
head screw (4pcs)
Two person
pic))
Need help?
Do you have a question about the Dynamique R3 and is the answer not in the manual?
Questions and answers