BLAUBERG CIVIC EC DB 1000 User Manual

BLAUBERG CIVIC EC DB 1000 User Manual

Single-room air handling unit

Advertisement

Quick Links

Single-room air handling unit
CiViC eC dB 1000
CiViC eC dBe 1000
CiViC eC dBe2 1000
EN
USER'S MANUAL

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CIVIC EC DB 1000 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for BLAUBERG CIVIC EC DB 1000

  • Page 1 Single-room air handling unit CiViC eC dB 1000 CiViC eC dBe 1000 CiViC eC dBe2 1000 USER'S MANUAL...
  • Page 2: Table Of Contents

    Warranty card ....................................23 This user’s manual is a main operating document intended for technical, maintenance, and operating staff. The manual contains information about purpose, technical details, operating principle, design, and installation of the CIVIC EC DB 1000 unit and all its modifications.
  • Page 3 CiViC eC dB 1000 blaubergventilatoren.de UNIT INSTALLATION AND OPERATION SAFETY PRECAUTIONS • Disconnect the unit from power mains prior to any • Unpack the unit with care. installation operations. • While installing the unit, follow • The unit must be grounded! the safety regulations specific to the use of electric tools.
  • Page 4 CiViC eC dB 1000 blaubergventilatoren.de • When the unit generates • Do not store any explosive or unusual sounds, odour, or highly flammable substances emits smoke, disconnect it in close proximity to the unit. from power supply and contact the Seller.
  • Page 5: Purpose

    CiViC eC dB 1000 blaubergventilatoren.de PURPOSE The unit is designed to ensure continuous mechanical air exchange in houses, offices, hotels, cafes, conference halls, and other utility and public spaces as well as to recover the heat energy contained in the air extracted from the premises to warm up the filtered stream of intake air.
  • Page 6: Technical Data

    CiViC eC dB 1000 blaubergventilatoren.de TECHNICAL DATA The unit is designed for application with the ambient temperature ranging from +1 °C to +40 °C and relative humidity up to 80 %. In order to prevent condensation on the internal walls of the unit, it is necessary that the surface temperature of the casing is 2-3 °C above the dew point temperature of the transported air.
  • Page 7: Design And Operating Principle

    CiViC eC dB 1000 blaubergventilatoren.de DESIGN AND OPERATING PRINCIPLE Warm stale extract air from the room flows into the unit, where it is filtered by the extract filter, then air flows through the heat exchanger and is exhausted outside by the extract fan. Cold fresh air from the outside flows into the unit, where it is cleaned by the supply filter. Then the air flows through the heat exchanger and is directed to the room with the supply fan.
  • Page 8 CiViC eC dB 1000 blaubergventilatoren.de...
  • Page 9 CiViC eC dB 1000 blaubergventilatoren.de CIVIC EC DB 1000 CIVIC EC DBE 1000 CIVIC EC DBE2 1000 1 Extract filter    2 Supply filters    3 Supply air damper actuator    4 Extract air damper actuator ...
  • Page 10: Mounting And Set-Up

    CiViC eC dB 1000 blaubergventilatoren.de MOUNTING AND SET-UP WHILE INSTALLING THE UNIT ENSURE CONVENIENT ACCESS FOR SUBSEQUENT MAINTENANCE AND REPAIR. BEFORE MOUNTING MAKE SURE THE CASING DOES NOT CONTAIN ANY FOREIGN OBJECTS (E.G. FOIL, PAPER). THE UNIT MUST BE MOUNTED ON A PLANE SURFACE.
  • Page 11 CiViC eC dB 1000 blaubergventilatoren.de UNIT INSTALLATION Mark the holes using the mounting bracket or template, drill holes for fasteners and through-holes in the wall Ø~350 mm for Ø 315 mm air ducts. Cut the air ducts to the required length, equal to the wall width, +15 mm to fix the unit to the spigots on the room side. From the outside of the room, the air duct must be cut flush with the wall of the building for the installation of ventilation grilles (purchased separately).
  • Page 12 CiViC eC dB 1000 blaubergventilatoren.de Detach the front block. Unscrew the screws on the front block and remove the panel with the louvre shutters. Detach the connectors for connecting control devices. Remove the screws and disconnect the front block from the three blocks attached to each other.
  • Page 13 CiViC eC dB 1000 blaubergventilatoren.de Install and tighten the mounting screws. Remove the outer casing with the service hatch on the right block and the casing on the left block. Install and tighten the mounting screws (supplied) to securely connect the middle block to the left and right ones.
  • Page 14 CiViC eC dB 1000 blaubergventilatoren.de Install the decorative panels. Install the decorative panels according to the marking using the screws and close the fastening holes with plugs.
  • Page 15 CiViC eC dB 1000 blaubergventilatoren.de Install the hinged doors. Remove the retaining screws before Hang the doors. Install the retaining screws to prevent the hanging the hinged doors. doors from sliding off. Attach the safety cables to the doors with the safety hooks.
  • Page 16 CiViC eC dB 1000 blaubergventilatoren.de Install the Wi-Fi antenna. Manually adjust the swing of the louvre shutters. CONDENSATE DRAINAGE ARRANGEMENT The unit is equipped with a drain pump for timely removal of condensate from the unit. Connect the flexible hose going from the pump outlet to the sewage system.
  • Page 17: Connection To Power Mains

    CiViC eC dB 1000 blaubergventilatoren.de CONNECTION TO POWER MAINS POWER OFF THE POWER SUPPLY PRIOR TO ANY OPERATIONS WITH THE UNIT. THE UNIT MUST BE CONNECTED TO POWER SUPPLY BY A QUALIFIED ELECTRICIAN. THE RATED ELECTRICAL PARAMETERS OF THE UNIT ARE GIVEN ON THE MANUFACTURER’S LABEL.
  • Page 18: Control

    CiViC eC dB 1000 blaubergventilatoren.de CONTROL The unit can be controlled using a wired wall control panel (S22, S25), a wireless wall control panel (A22 Wi-Fi) and a mobile app (S21). The panels and the app can be used together or separately.
  • Page 19 CiViC eC dB 1000 blaubergventilatoren.de 2. Heat exchanger maintenance (once per year). Some dust may accumulate on the heat exchanger even in case of regular maintenance of the filters. To maintain the high heat recovery efficiency, regular cleaning is required. To clean the heat exchanger, remove it from the unit and clean the heat exchanger by using compressed air or a vacuum cleaner.
  • Page 20 CiViC eC dB 1000 blaubergventilatoren.de 3. Fan maintenance (once per year). Even in case of regular maintenance of the filters, some dust may accumulate inside the fans and reduce the fan performance and supply air flow. Clean the fans with a soft cloth, brush, or using compressed air. Do not use water, aggressive solvents, or sharp objects as they may damage the impeller.
  • Page 21: Troubleshooting

    CiViC eC dB 1000 blaubergventilatoren.de TROUBLESHOOTING PROBLEM POSSIBLE REASONS TROUBLESHOOTING Make sure the power supply line is connected No power supply. correctly, otherwise troubleshoot a connection error. Turn the unit off. The fan(s) does (do) not start Troubleshoot the motor jam and the impeller when the unit is on.
  • Page 22: Manufacturer's Warranty

    CiViC eC dB 1000 blaubergventilatoren.de MANUFACTURER’S WARRANTY The product is in compliance with EU norms and standards on low voltage guidelines and electromagnetic compatibility. We hereby declare that the product complies with the provisions of Electromagnetic Compatibility (EMC) Directive 2014/30/EU of the European Parliament and of the Council, Low Voltage Directive (LVD) 2014/35/EU of the European Parliament and of the Council and CE-marking Council Directive 93/68/EEC.
  • Page 23: Certificate Of Acceptance

    CiViC eC dB 1000 blaubergventilatoren.de CERTIFICATE OF ACCEPTANCE Unit Type Single-room air handling unit Model CIVIC EC DB_______________ Serial Number Manufacture Date Quality Inspector’s Stamp SELLER INFORMATION Seller Address Phone Number E-mail Purchase Date This is to certify acceptance of the complete unit delivery with the user’s manual. The warranty terms are acknowledged and accepted.
  • Page 24 blaubergventilatoren.de B177-1EN-01...

This manual is also suitable for:

Civic ec dbe 1000Civic ec dbe2 1000

Table of Contents