Machine Record Log - Calorex PPT16 BHC Owners & Installation Manual

Table of Contents

Advertisement

PPT16/22 BHC & PPT16BMCY OWNER INSTALLATION MANUAL

13.0 MACHINE RECORD LOG

In order to comply with European F-Gas regulations, it is necessary for hermetically sealed systems with more than 6kg refrigerant to be leak tested annually. The operator of
the unit is responsible for seeing that the test is carried out.
For machines affected see datasheet. A sample log sheet can be seen below.
Dantherm Ltd. is an Fgas registered company. Certificate number REF1011570.
General Information
Plant Name
Location of Plant
Plant Operator (see note 1)
Operator Contact (see note 2)
Refrigerant Type
Plant manufacturer
Refrigerant Additions
Date
Refrigerant Removals
Date
Name and Address of Recycling or reclamation facility
Leak Tests
Date
Follow up Actions
Date
Testing of Automatic Leak Detection System (if fitted)
Date
1 Name and address of company operating plant.
2 Contact details for operator's nominated person responsible for F Gas compliance.
3 Company and technician carrying out work, with details to provide evidence of compliance.
IMPORTANT : The company carrying out refrigerant checking and removals, and the owner of the equipment need to keep records for FIVE
YEARS
When this machine is decommissioned the refrigerant gas is to be recovered in accordance with the current environmental legislation.
26
Dantherm Ltd.
Engineer (see note 3)
Company
Name
Engineer
Company
Name
Engineer
Company
Name
Engineer
Company
Name
Engineer
Company
Name
Serial Number
Refrigerant Quantity installed (kg)
Year of installation
Amount
Reason for addition
Added kg
Amount
Reason for removal What done with
recovered refrigerant
Removed kg
Certificate number if applicable
Test Result
Follow up action required
Related to test on
Actions taken
Test Result
Comments
SD638152 ISSUE 4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ppt22 bhcPpt16 bmcy

Table of Contents