Chapter 4: Preinstallation Checklist - Avaya 3500 Series Installation Instructions Manual

Ethernet routing switch
Hide thumbs Also See for 3500 Series:
Table of Contents

Advertisement

Chapter 4: Preinstallation checklist

Before you install the Avaya Ethernet Routing Switch 3500 Series, make sure that you complete the
tasks in the preinstallation checklist.
No.
Task
1.
Review the technical specification for
the switch. Make sure that the area
where you install the switch and
where it will operate meet the
requirements.
2.
Verify the AC power specifications.
Optionally order a redundant Power
Supply Unit (PSU) to provide
redundancy and load sharing.
3.
Make sure that you have the
following tools and cables:
• Phillips #2 screwdriver RJ-45
console port cable
• ESD cable
4.
Unpack the equipment.
5.
Verify the contents of the shipped
package.
6.
Make sure that the power cord has
the correct country-specific
termination.
7.
Depending on the switch model,
prepare the shelf or table or prepare
the equipment rack.
September 2016
Description
For the physical, electrical, and
environmental specifications, see
Technical specifications
See
AC power specifications
page 43.
See
Cable requirements
Observe ESD precautions when you
unpack the equipment. See
discharge
See
Package contents
a description of the components that are
provided with the switch.
See
AC power cord specifications
page 43.
If the switch model is ERS 3510GT or
ERS 3510 GT PWR+, prepare shelf or
table and ensure the surface supports
the combined weight of the switch and
attached cables from 15 and 20 pounds
(7 to 9 kilograms).
Installing Avaya Ethernet Routing Switch 3500 Series
Comments on this document? infodev@avaya.com
on page 16.
on
on page 22.
Electrostatic
on page 15.
on page 19 for
on
Table continues...
10

Advertisement

Table of Contents
loading

Table of Contents