2.1 GENERATOR SET INSTALLATION
The generator set is mounted under the center of the
trailer chassis and is easily handled with a fork lift truck
capable of handling 2,000 pounds. The fork lift pockets
provided are accessible from either side. Mounting
clamps are designed to be attached to outside I-beam
flanges only. Maximum chassis width is 38 inches on
center.
a. Standard Mount
1. Loosen mounting bolts (see Figure 2-1) sufficient
to push mounting plates to the outermost position.
2. Place forks into fork lift pockets of generator set.
Attach safety chain between unit and fork truck.
3. Center generator under chassis slide mounting
plates fully onto chassis I-beams and torque
mounting bolts to 80 - 90 ft-lbs (11.1 - 12.4 mkg).
Upon completion, remove safety chain before re-
moving forks of fork lift truck from unit.
CONTAINER FLOOR CROSS I-BEAMS
FORK LIFT POCKET
1.
Bolt
2.
Washer, Spherical, Male
3.
Mounting Plate
4.
Generator Frame
SECTION 2
OPERATION
A
A
A
ROADSIDE VIEW
5
6
7
8
SECTION A ‐ A
Figure 2-1 Generator Set Mounting − Standard Mount
b. Quick Mount
1. Loosen mounting bolts (see Figure 2-2) sufficient
to bring clamp to open position. To orient in open
position, lift nut end of bolt out of slot. Clamp will
fall open.
2. Place forks into fork lift pockets of generator. At-
tach safety chain between unit and fork truck.
3. Center the generator set in desired position under
chassis.
4. Lift clamp (item 1) in place, ensuring bolt (item 4) is
secured in slot.
5. Tighten bolt to 55 - 65 ft-lbs (7.6 - 9.0 mkg).
6. Upon completion, remove safety chain before re-
moving forks of fork lift truck from unit.
5.
Washer, Belleville
6.
Washer, Spherical, Female
7.
Tee Nut
8.
Roll Pin
2−1
REAR OF CHASSIS
1
2
3
4
T-343

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents