Alpha ESS SMILE-B3 Installation & Operation Manual page 26

Energy storage system
Hide thumbs Also See for SMILE-B3:
Table of Contents

Advertisement

`
Your Smart Energy
Installation
Step 9: Please drill holes directly on the wall at the marking positions of the brackets. Insert the
expansion tube and pass the expansion screw through the gasket and lock with a screwdriver.
NOTE: If the drill is not long enough, you can mark the hole positions before drilling.
Figure 2.25 Removing the maintenance cover
Step 10: Remove the maintenance cover before wiring.
Figure 2.26 Wiring positive power cable
Step 11: Pass the red positive power cable through the two BAT+ waterproof rings. And fix it on the
copper bars inside the battery and inverter.
___________________________________________________________________
Alpha ESS Co., Ltd.
Page 24 of 61

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents