Alpha ESS SMILE-B3 Installation & Operation Manual page 23

Energy storage system
Hide thumbs Also See for SMILE-B3:
Table of Contents

Advertisement

`
Your Smart Energy
Installation
Figure 2.17 Installing positioner
Step 2: Install the position limiter on the bottom as shown in Figure 2.17.
Figure 2.18 Taking out the battery
Step 3: Open the battery package. Pull off the buckle located in the middle of the bottom. Pull the top
two guide rods to remove the front panel, as shown in Figure 2.18.
NOTE: The box must be placed in the direction of the label and only remove the packaging in
upwards direction. Removing the packaging in other directions is wrong.
___________________________________________________________________
Alpha ESS Co., Ltd.
Page 21 of 61

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents