If the configuration network has been carried out successfully the light of the LED will follow
a light sequence (See
In case the light of the LED does not follow the sequence or start lighting different, start the
process from the beginning.
© HMS Industrial Networks S.L.U - All rights reserved
This information is subject to change without notice
Figure 3.8
Figure
3.5). To continue tap on done.
Enter password.
Device Configuration 1.0
URL
https://www.intesis.com
16 / 24
Need help?
Do you have a question about the Intesis AC Cloud Control and is the answer not in the manual?