Daikin RKC18QV2S Service Manual page 19

Table of Contents

Advertisement

Si001658EA
Step
2
Remove the terminal
cover.
3
Remove the protection
bushing.
4
Disconnect the
compressor lead wires
(U, V, W) and the
overload protector.
5
Cut the clamp.
6
Remove the putties.
7
Heat up the 2 brazed
parts and remove the
electronic expansion
valve.
Removal Procedure
Procedure
Protection bushing
Overload
protector
V (yellow)
Brazed part
Terminal cover
(R23737)
U (red)
W (blue)
(R23738)
Clamp
Electronic expansion
valve
Putty
(R23739)
Electronic Expansion Valve
Points
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents