Fitting The Control Unit - Buderus Logalux LTN Series Installation Instructions For Contractors

Dhw cylinder
Table of Contents

Advertisement

▶ Join thermal insulation sections 1 and 2 ( Fig. 10, page 13) by
means of the top hook locking bracket.
Fig. 17 Joining the thermal insulation with hook locking bracket
▶ Attach thermal insulation sections 3 and 4 ( Fig. 10, page 13) in
the same way as sections 1 and 2 ( Fig. 10, page 13).
Fig. 18 Attach thermal insulation sections 3 and 4
( Fig. 10, page 10).
Logalux LTN/LTD/LTH/LF 400...3000 – 6 720 818 806 (2015/12)
▶ Close the gaps on the bridge and feet with the fabric strips.
6 720 817 906-22.1T
Fig. 19 Close the gaps with the fabric strips.
[1]
Gap
[2]
Fabric strips
▶ Attach the adhesive rosettes on the bridge/feet.
6 720 817 906-23.1T
Fig. 20 Attaching the adhesive rosettes on the bridge/feet
5.4.2

Fitting the control unit

▶ Remove the recess cylinder of the cable hole from the thermal
insulation with a cutter blade.
Fig. 21 Removing the recess in the thermal insulation
Fitting
5
1
2
6 720 817 906-32.1T
6 720 817 906-25.1T
6 720 817 906-26.1T
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents