5.3

Fitting the manhole cover gasket

▶ Release the nuts and remove the manhole cover.
▶ Position the manhole cover gasket on the manhole cover.
The curved radius of the manhole cover and the formed radius of the
manhole cover gasket should lie precisely on top of each other.
Fig. 8
Fitting of manhole cover gasket
[1]
Manhole cover gasket
[2]
Manhole cover
Fig. 9
Manhole cover gasket positioned precisely on the manhole
cover
[1]
Manhole cover gasket
[2]
Manhole cover
▶ Insert the manhole cover with the manhole cover gasket into the
manhole and tighten it.
Logalux LTN/LTD/LTH/LF 400...3000 – 6 720 818 806 (2015/12)
1
2
6 720 817 906-36.1T
1
2
6 720 817 906-37.1T
5.4
Fitting the thermal insulation, control unit and
immersion heaters
We recommend fitting the thermal insulation only after
installation and leak test.
In the case of the 400 l cylinder size, the thermal insulation
consists of only 2 sections.
No fixing strap in the centre is required.
In the case of the 2000 l cylinder size and larger, a second
external current anode is fitted in the back panel (apart from
the LF series).
▶ Before fitting the thermal insulation sections C and D,
route the anode cable on the storage cylinder to the
control unit.
Fit the control unit and carry out all electrical work before
fitting the front panel.
The thermal insulation consists essentially of the insulation around the
edge, plus the front and back panel sections.
With the exception of the covers for the front panel and back panel, all
thermal insulation sections are marked with numbers for better
definition ( Fig. 10).
2
1
3
Fig. 10 Numbering schedule for thermal insulation sections
Fitting
4
6 720 817 906-06.1T
5
13