Optional Equipment; Unpacking - National Instruments GPIB-110 User Manual

Table of Contents

Advertisement

Description of the GPIB-110

Optional Equipment

You can call National Instruments to order the following optional equipment to go with your kit.
Rack-Mount Kit:
Transmission Cable*:
Type X2 GPIB Cable:
*For plenum cables, contact National Instruments.

Unpacking

Follow these steps when unpacking your GPIB-110:
1. Verify that the pieces contained in the package you received match the kit parts list
given earlier in this chapter.
2. Before you operate the GPIB-110, inspect the shipping container and its contents for
damage. Keep the packaging material for possible inspection and/or reshipment.
If the equipment appears to be damaged, do not attempt to operate it. Contact National
Instruments for instructions. If the damage appears to have been caused in shipment, file
a claim with the carrier.
3. The GPIB-110 is shipped from the factory with a 100 to 120 VAC or 220 to 240 VAC
power supply. Verify that the voltage on the power supply matches the voltage that is
supplied in your area.
Caution: Operating the GPIB-110 at any voltage other than the one specified could
damage the unit.
GPIB-110 User Manual
Equipment
Single Rack-Mount Kit
Dual Rack-Mount Kit
Type T3 – Fiber Optic Cable
Type T4 – Coaxial Cable
1 m
2 m
4 m
8 m
Part Number
180304-01
180304-02
178058-xxx
178057-xxx
(xxx = length in meters)
763061-01
763061-02
763061-03
763061-04
1-4
© National Instruments Corporation
Chapter 1

Advertisement

Table of Contents
loading

Table of Contents