Step 5. Prepare The Aircraft Engine Harness; Step 6. Make Electrical Interface Connections - Lycoming IO-390-D Series Installation And Operation Manual

Hide thumbs Also See for IO-390-D Series:
Table of Contents

Advertisement

IO-390-D Series Engine Installation and Operation Manual

Step 5. Prepare the Aircraft Engine Harness

Lycoming Engines can supply a wiring diagram to the aircraft manufacturer which is used to prepare
the aircraft engine harness.

Step 6. Make Electrical Interface Connections

Make electrical interface connections.
Grounding Requirements
Install grounding jumpers from the engine case to the engine mounting frame. (The engine mount
must also be grounded to the airframe).
Dual EIS Installations
Refer to the airframe manufacturers specifications to ensure the second EIS is connected to a backup
power source independent from the aircraft's electrical system.
Requirements for Engine Installation
© 2020 Avco Corporation. All Rights Reserved
Page 16
March 2020

Advertisement

Table of Contents
loading

This manual is also suitable for:

Io-390-d1a6Io-390-d3a6Io-390-d1b6Io-390-d3b6

Table of Contents