INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
3)
Lift the fifth wheel plate (8) using appropriate lifting devices for 150 kg
weights;
Warning! Limb injury hazards!
4)
Make sure that the fifth wheel plate (8) is safely anchored and secure
for extraction of the upper rubber bearing (29) . Dispose as specified in
section 9 - DISPOSAL - page 34/36;
5)
Position in the new upper rubber bearing (29)
making sure that the arrow marker points
towards the front end of the tractor unit;
6)
Rest the fifth wheel plate (8) back onto the
Pedestal (30);
7)
Lodge in the new lower rubber
bearing (28) making sure that the
arrow marker points towards the
front end of the tractor unit and
the fixing plate (27);
8)
Lock everything back on
using four screws (3a),
washers (25) and nuts (26);
Torque wrench setting 270-300 Nm.
Each time the rubber bearings are
N
O
replaced all the screws (3a) the washers
T
(25) and
E
the nuts (26) must be replaced. Dispose as
FIFTH WHEEL Rp10
29
3a
30
PAG.
28/36
CHAP. 7
REV. 00
8
28
27
25
26