Intel Gigabit Ethernet Expansion Card Installation Instructions Manual page 26

Table of Contents

Advertisement

16. Lower the cover so that the slots at the rear slide down onto the pins at
the rear of the blade server, as shown in the illustration.
Cover
pins
Air baffle
17. Pivot the cover to the closed position, as shown in the illustration, until it
clicks into place.
Statement 21:
CAUTION:
Hazardous energy is present when the blade is connected to the power
source. Always replace the blade cover before installing the blade.
18. Make sure that the release levers on the blade server are in the open
position (perpendicular to the blade server).
19. If a filler blade or other blade server was used to fill the empty bay
during installation of the I/O expansion card, remove it; then, slide the
blade server into the bay until it stops. The spring-loaded doors that are
farther back in the bay and cover the bay opening move out of the way as
you insert the blade server into the unit.
14
Intel Gigabit Ethernet Expansion Card for IBM ERserver BladeCenter: Installation Instructions
Blade cover

Advertisement

Table of Contents
loading

Table of Contents