Front Frame
•
Box these frame sections together.
2 OFF: C2400 + C2400
•
Assemble the side mullions.
2 OFF: ZACO216 + ZACO216 + C2755
•
Lay the components out as shown below, using the
same dimensions as the rear frame. Fix with teks in
the same manner.
•
S2992 have cutouts that allow it to fit over the centre
and side mullions and other frame members.
•
Take particular notice of the different views below
to determine which way sections fit into others.
Some pieces have end notching that must be
orientated correctly.
•
Do not fit the centre mullion trim, TR71, or the
brackets BKT17, used for anchoring the frame to
the slab at this stage.
•
Refer to the engineering drawings for further fixing
details.
Header beams are
BKT17 at either end
410
Absco Industries
Assembly Instruction Manual
ABSCO GARAGE
MODEL: RG60602N2
6.00mW x 6.00mD x 3.40mH
secured by two
2400
300
S2992
N1365
Side mullion assembly
ZACO216
Flush at base
Open section faces outward
2400
Model: RG60602N2
C1080
C1140
ZACO215
C2400
C2400
K0260
C0100
C2755
410
22/10/19
C2750
C2755
ZACO216
ZACO216
TR71
13