Installation Requirements; Tools And Parts; Location Requirements - Haier HCH6500ALS Installation And User Manual

36" island
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION REQUIREMENTS

TOOLS AND PARTS

Gather the required tools and parts before starting installation. Read and follow the
instructions provided with any tools listed here.
TOOLS NEEDED
Level
Drill with 1¼" and ¹⁄₈" Drill Bits
Pencil
Wire Stripper or Utility Knife
Tape Measure or Ruler
Pliers
Caulking Gun
PARTS NEEDED
6" dia. round metal duct - length required is determined by ceiling height.
PARTS SUPPLIED
Remove parts from packages. Check that all parts are included.
Vent Hood Assembly (including a
metal grease filter and a charcoal
filter)
120 V Power Cord (with 3 prong plug)
Two-piece Vent Structure (upper and
lower)
Two-piece Vent Cover (upper and
lower)
Phillips Self-drilling
Screws (16)

LOCATION REQUIREMENTS

IMPORTANT: Observe all governing codes and ordinances.
Have a qualified technician install the range hood. It is the installer's responsibility to
comply with installation clearances specified on the model/serial rating plate. The
model/serial rating plate is located behind the left filter on the rear wall of the vent
hood.
Canopy hood location should be away from strong draft areas, such as windows,
doors and strong heating vents.
Grounded electrical outlet is required. See "Electrical Requirements" section.
Caulking Compound (weatherproof)
Vent Clamps
Jigsaw or Keyhole Saw
Flat-blade Screwdriver
Metal Snips
Phillips Screwdriver
Phillips Pan-head
Screws (8)
Small Phillips Pan-head
Screws (3)
Phillips Countersunk-
head Screws (4)
5

Advertisement

Table of Contents
loading

Table of Contents