Installation Clearances - Haier GE UVC9420 Installation Instructions Manual

Custom insert hood
Table of Contents

Advertisement

INSTALLATION CLEARANCES

This vent hood must be installed between the 30"
required minimum and 36" recommended maximum
above the cooking surface.
instructions for product-specific clearances.
NOTE: Installation height should be measured from
the cooking surface to the bottom edge of the cabinet
surface.
NOTE: UL requires any combustible surface to be a
minimum of 30" above the cooking surface. Lower
combustible surfaces may be covered to meet
requirements.
minimum for vertical venting.
49-2000930 Rev. 1
Installation Preparation
installed over an island.
17" min.
12-1/2"
NOTE: The exhaust duct on the hood is closer to
the rear of the hood. It is important to plan for the
alignment to the connection point of the hood.
*30" Minimum required
*36" Maximum recommended
Typically 36"
7-5/8"
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ge uvc9480

Table of Contents