Electrical Requirements - Haier HCH6500ALS Installation And User Manual

36" island
Table of Contents

Advertisement

Available languages

Available languages

General Ventilation
The vent hood is designed to vent through the roof.
Vent system must terminate to the outdoors.
Do not terminate the vent system in an attic or other enclosed area.
Use metal vent only. Rigid metal vent is recommended. Plastic or metal foil vent
is not recommended.
The length of vent system and number of elbows should be kept to a minimum
to provide efficient performance.
Always keep the duct clean to ensure proper airflow.
Roof Venting:
b

ELECTRICAL REQUIREMENTS

Observe all governing codes and ordinances.
Ensure that the electrical installation is adequate and in conformance with National
Electrical Code, ANSI/NFPA 70 (latest edition), or CSA Standards C22.1-94,
Canadian Electrical Code, Part 1 and C22.2 No. 0-M91 (latest edition) and all local
codes and ordinances.
If codes permit and a separate ground wire is used, it is recommended that a
qualified electrician determine that the ground path is adequate.
A copy of the above code standards can be obtained from:
National Fire Protection Association
1 Batterymarch Park
Quincy, MA 02169-7471
Canadian Standards Association
178 Rexdale Blvd.
Toronto, ON M9W 1R3 CANADA
It is important to make sure you have the proper electrical connection.
a
a
b
Roof Cap
6" (15 cm) round vent
7

Advertisement

Table of Contents
loading

Table of Contents