Spectra POWERBOX 100-J19 RTE Instructions Manual

Spectra POWERBOX 100-J19 RTE Instructions Manual

Industrial pc systems

Advertisement

Quick Links

SPECTRA
INDUSTRIAL PC SYSTEMS
INSTRUCTIONS
VERSION 1.2 – OCTOBRE 2018

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the POWERBOX 100-J19 RTE and is the answer not in the manual?

Questions and answers

Summary of Contents for Spectra POWERBOX 100-J19 RTE

  • Page 1 SPECTRA INDUSTRIAL PC SYSTEMS INSTRUCTIONS VERSION 1.2 – OCTOBRE 2018...
  • Page 2 By purchasing this industrial PC system you have opted for a robust device tailored to industrial requirements. ABOUT US Spectra GmbH & Co. KG was founded in 1982 and has developed into a renowned supplier of products for industri- al and industry-related computer applications in Germany.
  • Page 3: Table Of Contents

    INSTRUCTIONS FOR SPECTRA INDUSTRIAL PC SYSTEMS INHALTSVERZEICHNIS 1. NOTES 4. DURING USE ..................................1.1 General notes 4.1 BIOS settings ............................... 1.2 Radio interferences 4.2 BIOS update ............................1.2.1 Radio installation ........4 4.3 Operating system ..............1.3 Product's information 4.4 Operation...
  • Page 4: Notes

    1.3.2 DEVICE DRIVERS The drivers required for commissioning can also be downloaded from our homepage via the link to the correspon- ding manufacturer: www.spectra.de. Further information can be found in the data sheet. Spectra GmbH & Co. KG Sales offi ce Austria Spectra (Schweiz) AG sales@spectra.de...
  • Page 5: Safety Instructions

    INSTRUCTIONS FOR SPECTRA INDUSTRIAL PC SYSTEMS 2. SAFETY INSTRUCTIONS 2.1 INTENDED USE This industrial PC system was manufactured for general industrial use. This includes e.g. Industrial image proces- sing, quality assurance and monitoring, measurement and control technology, data acquisition and evaluation.
  • Page 6: Safety Notes

    INSTRUCTIONS FOR SPECTRA INDUSTRIAL PC SYSTEMS 2.4 SAFETY NOTES ELECTRICITY HAZARD Never open the power supply cover. The power supply fan is not intended for maintenance. If the fan is defective, replace the power supply unit. Only use power supplies and supply lines with protective conductor connection.
  • Page 7: Before Use

    INSTRUCTIONS FOR SPECTRA INDUSTRIAL PC SYSTEMS 3. BEFORE USE 3.1 TRANSPORT & STORAGE Please check the packaging for possible transport damage. Check the accessories. Observe the transport and storage conditions described in the data sheet and ensure that they are observed. Before commissioning, the device must be accustomed to the ambient conditions for at least two hours.
  • Page 8: Rack-Mount

    INSTRUCTIONS FOR SPECTRA INDUSTRIAL PC SYSTEMS 3.2.2 RACK-MOUNT When installing the IPC in a closed rack unit, the following conditions must be taken into account compared to a free-standing structure: - The temperature can be signifi cantly higher due to the enclosed air volume and the additional internals.
  • Page 9: Fixtures

    INSTRUCTIONS FOR SPECTRA INDUSTRIAL PC SYSTEMS 3.4 FIXTURES According to the specifi cation, one PCI slot may be loaded with a maximum of 10 watts, one PCIexpress slot with 25 watts and one PCIe x16/PEG slot for graphics cards with 75 watts. Additional power consumption may only be made with additional connections to the power supply unit.
  • Page 10: During Use

    INSTRUCTIONS FOR SPECTRA INDUSTRIAL PC SYSTEMS 4. DURING USE 4.1 BIOS SETTINGS If you have purchased the device without an operating system, you may need to make settings in the BIOS to adjust the boot sequence, RAID system UEFI mode, etc.
  • Page 11: Lcd Screens And Touchscreens

    INSTRUCTIONS FOR SPECTRA INDUSTRIAL PC SYSTEMS 4.5.1 LCD SCREENS AND TOUCHSCREENS It is recommended to use a cleaning agent specially designed for LCD screens. Do not use cleaners containing alcohol or acetone. Always use a cloth for cleaning. Never spray the cleaning liquid directly onto the device to prevent the liquid from penetrating.
  • Page 12: After Use

    INSTRUCTIONS FOR SPECTRA INDUSTRIAL PC SYSTEMS 5. AFTER USE 5.1 DISASSEMBLY If possible, separate metal and electronic components for disposal. If possible, remove the CMOS battery. If a UPS is installed in your product, refer to the supplied manufacturer's documents for storage, transportation, and disposal instructions.
  • Page 13: Warranty Conditions

    6.2.1 PURCHASE VIA A PARTNER If you have not purchased the device via Spectra GmbH & Co. KG but a partner, system integrator or as part of a system, customer-specifi c changes and confi gurations may have been made about which Spectra has no knowled- ge.
  • Page 14: Backup Of Data Carriers

    INSTRUCTIONS FOR SPECTRA INDUSTRIAL PC SYSTEMS Please observe our packaging guidelines: Protection against mechanical damage The packaging must adequately protect the device, module or accessories from mechanical damage during transport and storage. The packaging must be suffi ciently padded for this purpose. If you are unsure, use an outer carton.
  • Page 15 INSTRUCTIONS FOR SPECTRA INDUSTRIAL PC SYSTEMS NOTES Spectra GmbH & Co. KG Sales offi ce Austria Spectra (Schweiz) AG | 15 sales@spectra.de sales@spectra-austria.at sales@spectra.ch...
  • Page 16 Spectra GmbH & Co. KG Spectra GmbH & Co. KG Spectra (Schweiz) AG Mahdenstr. 3 Gewerbepark Ost 1 Flugplatzstr. 5 72768 Reutlingen 4621 Sipbachzell (Wels) 8404 Winterthur Germany Austria Switzerland +49 (0) 7121 1432-10 Phone +41 (0) 43 27710-50 Phone...

This manual is also suitable for:

153281

Table of Contents