START UP
**** WARNING ****
THERE ARE DANGEROUSLY HIGH VOLTAGES PRESENT WITHIN THE ENCLOSURE OF
THE POWER SUPPLY SYSTEM. CAUTION MUST BE TAKEN WHEN WORKING WITH
THE ENCLOSURE. IT IS RECOMMENDED THAT ALL WORK BE PERFORMED BY
QUALIFIED ELECTRICAL PERSONNEL ONLY.
NOTE: INITIAL START-UP SHOULD BE PERFORMED WITH NO LOAD ON SYSTEM.
1. Re-install all panels that may have been removed during installation.
2. Make sure the input circuit breaker is in the off position.
3. Energize the primary building power.
4. Turn on the main AC input breaker.
5. Verify that the output voltage is within the specified range.
6. Verify output phase rotation is correct.
7. Turn the system off.
8. Connect the loads one at a time and repeat Step 4.
OPERATION
MONITORING
Two (2) digital output meters shall be provided. One shall monitor the 208/120 VAC output and the other
shall monitor the 480/277 VAC output. Each meter shall monitor and display Line-to-Line and Line-to-
Neutral voltages. Minimum and maximum voltage values shall be recorded in EPROM. High and low
output voltage limit alarms shall be programmable and a visual indication given if limits are exceeded.
For function and use, see the monitor manual supplied with the Power Conditioner.