Download Print this page

Installation - Cooper Lighting Sure Lites EBP1400NCX Instruction Manual

Advertisement

EBP1400NCX and EBP1400NCF Instruction Manual

INSTALLATION

WARNING: to prevent high voltage on Red / White, Red,
and Yellow output terminals prior to installation, the Test
Button / Indicator Light must be disconnected. Connect
the Test Button / Indicator Light after installation.
NOTE: Make sure that the necessary branch circuit
wiring is available. An unswitched source of power is
required.
1. Disconnect AC power from the fixture. Remove the
ballast channel cover. Install the emergency ballast
with grounding screws either in the ballast channel
(see illustrations 1 & 2) or on top of the fixture (see
illustration 3 / EBP1400NCX only).
2. Select the appropriate wiring diagram to connect
the emergency ballast to the AC ballast and lamp.
Make sure all connections are in accordance with the
National Electrical Code and any local regulations.
(See Illustrations 4 and 5 for terminals).
3. Refer to the lamp compatibility table for the HIGH
(Red) or Low (Red / White) connection per the lamp(s)
being illuminated by the emergency ballast.
4. Install the test button / indicator light through the
ballast channel cover of a troffer (Illustration 1 & 6)
or through the side of a strip fixture (Illustration 2 &
7). Drill or punch a 7/8" hole to install the test button
/ indicator light as shown in illustration 6. Drill or
punch a 1/2" hole to install the test button / indicator
light as shown in illustration 7. Install the test button
/ indicator light as shown in the selected illustration.
Apply the two included labels ("Charging Indicator
Light" and "Emergency Light Push to Test") adjacent
to the test button indicator light.
5. In a readily visible location, attach the included label
"CAUTION – This unit Has More Than One Power
Connection Point. To Reduce The Risk Of Electric
Shock, Disconnect Both The Branch Circuit-Breakers
Or Fuses and the Test Button / Indicator Light Before
Servicing" .
6. In an area readily visible during relamping, attach the
included relamping label. Write in the lamp type and
wattage.
7. After installation is complete, connect the test
button / indicator light. The factory installed version
(EBP1400NCF) will have 2 twisted wires (brown and
purple) at the access plate which must be connected
for the fixture to operate in emergency mode.
8 Replace covers being careful not to pinch wires, install
lamps, supply AC power to the emergency ballast.
9. A short term discharge test may be conducted after
the emergency ballast has been charging for one
hour. Charge for 24 hours before conducting a long –
term discharge test. Refer to OPERATION.
2
COOPER LIGHTING SOLUTIONS
ADX142715
Installation instructions
Illustration 1
Emergency
Ballast
Test Button/
Indicator Light
Ballast
Channel
Cover
Illustration 2
Emergency
Test Button/
Indicator Light
Illustration 3
Wire Bundle
Cover
Drill 1/8˝ Hole
for Mounting
Screws
EBP1400NCX only
Ballast
Emergency
Ballast
Wire Bundle
Cover
1/2˝ Std. Knockout
7/8˝ Hole w/Bushing

Advertisement

loading

This manual is also suitable for:

Sure lites ebp1400nc