CA-800-Install.book Seite 28 Mittwoch, 4. Juli 2007 3:05 15
Installation
After installing the system, the specified parameters of the system soft-
ware must be checked (see chapter "Configuration of system software" on
page 32).
6.2

Installation steps

WAECO International only assumes liability for parts included in the scope
of delivery. The validity of the warranty expires if the device is installed to-
gether with third-party parts.
Check whether the roof of the vehicle is able to support the weight of a
person before climbing onto it. Ask the vehicle manufacturer about the per-
mitted roof loads.

6.2.1 Make the roof hatch

➤ Remove all screws and fixtures of the existing sunroof.
➤ Take out the sunroof.
➤ Remove the sealing material from around the opening so that the sur-
face is clean and free of grease.
Dispose of all waste material, glue, silicone and seals separately. Observe
the disposal guidelines.

6.2.2 Prepare the system

While preparing the system on the work surface, make sure it does not fall.
Make sure that the surface is even and clean so that the system is not
damaged.
➤ Lay the roof air conditioner on a work surface with the housing facing
downwards.
➤ Remove the four M8 bolts, spring washers and washers from the four
threaded bolts (see fig. 2 on page 3, Pos. 1).
➤ Place the four spacer sleeves L= 3 mm (see fig. 3 on page 3, Pos. 4)
on the four threaded bolts (see fig. 3 on page 3, Pos. 6).
➤ Stick the 2 m long insulation tape (25 x 10 mm, see fig. 3 on page 3,
Pos. 5) into the existing cavity in the system. Apply a plastic, non-hard-
ening sealing compound (for example, SikaLastomer-710) to the im-
pact edge and the top edge of the insulation tape.