DCS Proto-Sound 2.0 Diesel/Electric Locomotive Upgrade Kit Installation Manual page 21

Table of Contents

Advertisement

-Solder the wires from
the 12-pin chassis
harness to the existing
volume pot. Red wire to
the center terminal, blue
to one outer terminal
and gray to the other
outer terminal.
Note: Volume pot not
required for command
operation. Solder gray
and red wires together
to get full volume in
conventional mode and
insulate the blue wire
from chassis ground.
-Place the double-sided
foam tape (S) on the
chassis floor in the
location established
previously.
-Secure the AA
rechargeable Ni-Cd
battery pack (I) using
the double-sided foam
tape.
Solder the red, blue and gray volume pot wires to the
volume pot. Red to the center terminal and blue and
gray to the outside terminals.
Use the double-sided tape to secure the battery pack
to the chassis floor. Connect the battery harness to
the battery pack. Note in the example above how the
foam tape is also located between the volume pot and
the battery pack.
PS-2 Upgrade Kit Installation Guide
21

Advertisement

Table of Contents
loading

Related Products for DCS Proto-Sound 2.0 Diesel/Electric Locomotive Upgrade Kit

Table of Contents