Installing The Battery, Recharging Jack & Volume Pot - DCS Proto-Sound 2.0 Diesel/Electric Locomotive Upgrade Kit Installation Manual

Table of Contents

Advertisement

Installing The Battery, Recharging Jack and Volume Pot
-Plug the 2 pin battery
pack connector into the
PS-2 board.
CAUTION: Position
the battery pack close
enough to the PS-2
board so it does NOT
require lengthening of
the battery pack or
battery recharging port
harnesses.
Lengthening either of
these harnesses will
reduce the battery
voltage to the board
and may affect
operation.
-Mount the 2-Pin
battery recharging jack
(II) to chassis floor
using hardware (III) as
shown on the right.
20
The battery pack connector comes pre-mounted to the
recharging jack and battery pack cable. It plugs into
the PS-2 Circuit board as indicated by the arrow.
Insert the spacers (III) between the recharging jack
board and the chassis floor to prevent the recharging
jack from extending below the chassis floor. Secure
with screws from underside of frame and nuts.
PS-2 Upgrade Kit Installation Guide

Advertisement

Table of Contents
loading

Related Products for DCS Proto-Sound 2.0 Diesel/Electric Locomotive Upgrade Kit

Table of Contents