Activating The Control Unit - Invacare SoftCloud Ace User Manual

Alternating matress systems
Hide thumbs Also See for SoftCloud Ace:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
IMPORTANT!
– Ensure that the foot bed end is robust enough
to support the control unit safely.
– Ensure there are no sharp objects which may
come into contact with the mattress system.
– Check that the attachment of the mattress
does not interfere with the movement or
operation of the bed.
– Do not secure straps to bed side rails as straps
will tear.
– Ensure that the positioning of the system does
not interfere with the ability to disconnect the
electrical power.
– Prior to activation ensure the CPR valve located
near the head end of the mattress is fully
engaged and that the mattress connector is
firmly connected to the control unit.
1. Remove all covers, sheets and mattress from the bed.
2. Place the mattress directly on the frame of the bed.
3. Position the mattress top cover facing upwards and air
hoses at foot of bed for control unit positioning.
4. On a standard bed, attach to the bed by securing the
two adjustable straps under each end of the bed. Ensure
buckles are securely fastened and straps are pulled tight.
Or
On a profiling bed, secure the two adjustable straps
around the moveable sections of the bed.
1630732-B

4.3 Activating the control unit

1. Position the control unit by hanging the hooks over the
foot board of the bed or side rails, ensuring that they
are robust enough to hold the control unit.
CAUTION!
– Ensure the air hose does not kink between the
bed frame and control unit.
2. Connect the mattress connector to the control unit.
IMPORTANT!
– Ensure that the power cord is in good condition.
3. Insert the power cord into the control unit then plug
into a grounded 220V 50Hz electrical outlet.
Setup
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Softcloud pro

Table of Contents