Rev 6 Mar.13
Proprietary and Confidential - Contents subject to change
Module integration testing
When testing your integration design:
•
Test to your worst case operating environment conditions (temperature and
voltage)
•
Test using worst case operation (transmitter on 100% duty cycle, maximum
power)
•
Monitor temperature at all shield locations. Attach thermocouples to the areas
indicated in
Figure 8-4 on page 60
Baseband 2).
Note: Make sure that your system design provides sufficient cooling for the module. RF
shield temperature should be kept below 90
module's components.
(For acceptance, certification, quality, and production (including RF) test
suggestions, see
Testing on page
Mechanical and Environmental Specifications
(Transmitter, Baseband 1, Receiver,
°
C when integrated to prevent damage to the
71.)
61