Maintenance; Replacement Parts - Honeywell Manning AirScan iR Instruction And Installation Manual

Refrigerant sensor for industrial applications
Table of Contents

Advertisement

Maintenance

Expose each sensor to test gases monthly to verify
that the sensor has a normal response. This will
also check the alarm lights and relay action of the
monitoring equipment.
It is essential that signal voltages be taken and
logged on a consistent basis at least monthly.
Periodically, sensors should be exposed to
refrigerant sample and the results logged.
For proper operation it is essential that the test
and calibration schedule be adhered to. Honeywell
Analytics recommends the following maintenance
schedule:
• Calibration should be performed with certified
calibration gas every six months. Calibration kits are
available from Honeywell Analytics.
• All tests and calibrations must be logged. It is highly
recommended that certified calibration gas be used
every six months.
AirScan iR - Industrial

Replacement Parts

For replacement parts, contact Honeywell Analytics.
Be sure to give the serial number and the model
number of the unit.
23

Advertisement

Table of Contents
loading

Table of Contents